This progress happened on 6/1 and 6/2.
No exterior changes on those days, but lots going on inside.
Roofing materials still awaiting installation |
Morning room ceiling, box is for hanging light fixture |
4 recessed and 3 pendants in the kitchen |
6 total recessed in the great room area, 4 in the great room and 2 in the "dinette" |
Switch box on left: 3 switches for flood lights plus 1 for the coach light Switch box on right: MR light, MR outlet, Kitchen Recessed |
4 recessed above the dining room (library) and 2 above the foyer |
Light box above study |
2 recessed in upstairs hallway |
Ceiling fan box in Bedroom 2 |
Upstairs bath, recessed over tub, exhaust fan box and vanity light |
Ceiling fan box in Bed 3 |
Ceiling fan box in Bed 4 |
Another view of the hallway |
Ceiling fan box in the master |
Ceiling lights in the master closet |
Ceiling light in the sitting area |
Vanity lights in the master bath |
Fan box and recessed light above master shower |
Took this pic of where Bed 3 meets the garage overhang area. It is dead space as it sits, so we may eventually cut a closet opening here for some extra storage. |