We had a relatively dry day yesterday so on the way home from work I stopped for some additional photos. I saw that the electrical items were set and that our steel beams were on the ground across the street.
New Construction Bateman - Ryan Homes in the Syracuse, NY area.
Showing posts with label Foundation. Show all posts
Showing posts with label Foundation. Show all posts
Wednesday, May 13, 2015
Tuesday, May 12, 2015
Lot Backfilled
Plenty of rain in the last 36 hours in this area. I haven't been by the lot, but Kari sent some photos of the site now that the dirt is pushed back in.
The good news is that the egress window is in the right place and it looks like the two hopper windows are properly formed.
When I initially saw the dig it looked like the sanitary and water service came in at a different location than the one we had discussed at the Pre-Con, but I am not worried about these as they'll end up in what we plan to be a storage area regardless.
I did see in my other pictures that the hole for electrical sleeve under the garage was drilled. I'm hoping they put the conduit in place before filling and will have to check next time I'm on the site.
The good news is that the egress window is in the right place and it looks like the two hopper windows are properly formed.
When I initially saw the dig it looked like the sanitary and water service came in at a different location than the one we had discussed at the Pre-Con, but I am not worried about these as they'll end up in what we plan to be a storage area regardless.
I did see in my other pictures that the hole for electrical sleeve under the garage was drilled. I'm hoping they put the conduit in place before filling and will have to check next time I'm on the site.
Saturday, May 9, 2015
Foundation Forms Removed
Yesterday (Day 4) brought the removal of the concrete forms.
On our weekly call, our PM let us know that early next week they will be back-filling the site then awaiting the lumber delivery to start framing.
He hasn't given a time frame, but my best guess so far is that once we start framing we'll be in that phase for around 10 work days due to the size of the home (based on what I've read on other blogs).
I didn't take pictures of it, but the development is really starting to clean up! Many of the completed houses have now received some topsoil and some have been hydroseeded. The model got new sod and all around it received new soil and seed.
We stopped in today and gave our SR a gift for his birthday and noticed that the map on the wall is filling quickly. He discussed that the start schedule has a couple houses on it each week through mid June, so we'll see lots of action in the community over the summer!
![]() |
| Pan shot of the site. |
![]() |
| Pan shot of the site. Lots of progress in four days! |
![]() |
| View of the front stoop. Lots of sun this week! It was over 90F on Friday! |
![]() |
| Delta MS Waterproofing Material |
![]() |
| Garage door location. What are those cutouts on the side walls for? |
On our weekly call, our PM let us know that early next week they will be back-filling the site then awaiting the lumber delivery to start framing.
He hasn't given a time frame, but my best guess so far is that once we start framing we'll be in that phase for around 10 work days due to the size of the home (based on what I've read on other blogs).
I didn't take pictures of it, but the development is really starting to clean up! Many of the completed houses have now received some topsoil and some have been hydroseeded. The model got new sod and all around it received new soil and seed.
We stopped in today and gave our SR a gift for his birthday and noticed that the map on the wall is filling quickly. He discussed that the start schedule has a couple houses on it each week through mid June, so we'll see lots of action in the community over the summer!
Thursday, May 7, 2015
Footers Done & Foundation Poured - Whoa!
![]() |
| Closer to the inside edge of the garage. Ignore the edit out of people from the picture! |
![]() |
| Near the northeast corner of the house. The rear garage door will go on that back wall to the left and beyond that is the morning room cutout. In the background center right of this image you can see Kari's Sienna! |