Friday, July 31, 2015

Busy Busy!

Not much to write today but many things are happening!

FiOS is installed and operational.
All of our new kitchen appliances were delivered.
The HUGE roman shower is AWESOME!
The ceiling fan in the GR is installed.
The ceiling fan in the master bedroom is installed.
The mailbox is up.
The driveway has been dug/expanded and stone put down.
I installed conduit under the driveway in case we ever switch to cable rather than FiOS.
I ran the gutter drainage under the stone of the driveway with PVC.
Fridge is fully functional.
Microwave swapped out.
Included stove is removed and we'll hook up the new range later today.

Most importantly: Central Air Conditioning is being installed as I write this post!!!

Still on the hunt for some counter height stools for the island.

Goals for this weekend:
-Move the big stuff (furniture, washer dryer) from our old house
-Install garage door opener on primary door
-Swap in new dishwasher

"Before" shot of the kitchen with all of the included appliances.

We installed the new microwave last night!

Fantastic views last night.  Our community has no street lights and the sky was BRIGHT!

Found this at Home Depot.  Considering putting 2 or 3 in the garage to replace the junk included fixtures.

Wednesday, July 29, 2015

We closed!

Hi all!

I have lots of updates coming and photos to share. We have been in a mad rush since closing on Tuesday.

We have started various projects, begun to move, and have had plenty of vendors through the house for various things.

For now, here are some shots. Next week should allow more time to post!

Closing gift from Kari and Andre! 

The ceiling fan we installed in the Great Room. We want to find a less bulky shade/globe for the light. 

Friday, July 24, 2015

Pre-Settlement Demonstration

Our final walk through is in the books.

We didn't spend much time on the appliances since I let the PM know that we are replacing them all the morning after we close on the house.  I'm going to list them for sale on Craigslist today.

Overall, the house looked great!

There were a few issues with the finishing but they were mostly minor and easy fixes.

PM is ordering a new stair baluster to replace the cracked one.

We noted a scratch in the resilient flooring that will be repaired.

The kitchen countertop issue is being resolved after closing.

We are waiting on a replacement cabinet door.

We noted that some other cabinets were scratched and or blemished.  PM is ordering new materials to fix those areas.

PM is going to have the master bath shower outer tile seam (outside the door) re-worked as the grout doesn't look great. (Note on this - the framing was a bit wide so the shower door fell in a spot where it wouldn't be able to mount to anything.  They doubled up the concrete backer board to make up the difference).

They had missed an exterior window in painting the trim.

They are going to power wash the basement floor (again) to clean up the remaining dirt.  It was pretty rough from the mud/water issues that happened during construction.

I'm sure I'm missing something and will post more notes later if I think of them.  For now, we're inventorying things and working on our current house to prep it for sale.  We have lots of deliveries coming with stuff for the new house and can't wait to begin the transition!!

Thursday, July 23, 2015

Cleared to Close!

We are cleared to close!

Closing is set for Tuesday July 28, 2015 at 1:00pm.


T-5 Days!

We close in 5 days!

Our neighbor let us know that there were probably 20 people working in our house today.

We can't get in, but from the outside we can tell that the kitchen pendants were installed.  The front door was painted, the house was power washed, the trim was cleaned up (and it looks like painted as well).

Lots of progress and it looks like everything is on track!!

I love the siding color, especially when there isn't much sun.


Wednesday, July 22, 2015

Garage Door Opener Ordered

Just ordered the Chamberlain WD962KEV Whisper Drive Garage Door Opener with MyQ Technology and Battery Backup from Amazon.



This unit has all of the bells and whistles expected of a modern garage door opener. Battery backup, Wi-Fi capability (accessory required!), and its quiet (very quiet!).

To enable the WiFi functionality (they call it MyQ) you either need to purchase their Chamberlain CIGBU MYQ Internet Gateway or any garage door opener network kits.

I won't be using the Chamberlain MyQ kit as I will be tying in the opener to my whole-house Z-Wave setup.  Details on that whole home setup are still coming, so stay tuned!

I'll share the installation process and my review after we get the unit up and running.

Ceiling Fans

We ordered two of our five or so ceiling fans for the house today.  The master bedroom and the great room.

We did the rough-in in the master, but didn't think about the Great Room ahead of time.  This will likely be one of the first of my project posts to demonstrate how we go about installing it.  The nice thing for the fan we chose is that the wall switches aren't much use and it is all digitally controlled from a remote.

In the great room, we are installing the Harbor Breeze Slinger 72-in Brushed Nickel Downrod Mount Ceiling Fan with Light Kit and Remote Control (9-Blade).  We bought the fan from Lowe's and used a 10% coupon for a bit of a discount.  Check it out here.

 The fan is large and moves a ton of air.  It should be perfect for the space.  We hate the light dome cover and will either replace it with a different dome shape or remove the light kit altogether since we will have the recessed lights in the great room.


In the master bedroom we are installing the Hampton Bay Sussex II 52 in. Brushed Nickel Ceiling Fan.  We like the look of this fan and the reviews are solid.  We needed a fan with a light since we won't have the recessed lights in the bedroom yet (installing them when we get to it).  We bought the fan from Home Depot with no sale/coupon.  It was middle-of-the-pack in terms of price but we really wanted to look.  I'll be keeping an eye on price changes for the next 90 days and would get a price match during the return policy if that happens.  Check it out here.
An important thing to mention about this fan is that it uses candelabra base bulbs.  We'll be getting adapters on Amazon to convert to the typical Edison socket and will be using LED bulbs inside this.

We still need to pick the fans (with lights) for the three other bedrooms - but since they won't be occupied anytime soon that isn't high on the priority list.

Now to order a garage door opener!

Verizon FiOS Moving Advice

Just a quick note to all of my fellow FiOS users!

If you are moving from an address with FiOS to a new address that is FiOS accessible, the process is a bit interesting.  I began with an internet search and I didn't find much help.  The transfer of service to the new address didn't seem to be available.

http://www.verizon.com/home/shop/moving.htm

That website seemed to be a logical starting point... Until I realized that it wouldn't allow me to keep our existing contract.  We would be required to end that contract (fee waived) and sign up for a new plan at the new property.  I wasn't cool with this.  We have special pricing from a holiday promotion that we would lose while doing this...

So, I made some calls.  I spoke with a friend who works in FiOS support and he spoke with some customer service people.  The end result was that there is a way to bring your existing service with you!

Call the customer service line. 888-781-5510 - go through the series of prompts.  I believe 2 for service, 4 for "other" and 1 for moving.  You'll verify your account and eventually be connected with a rep.

The key now is to mention that you want to bring your existing service with you.  Mention that you've done your research, you don't want to change your service package, and you need a "To and From" move order.  That phrase is the key.

The rep spent some time looking into if it was an option for our change and confirmed that it was.  He waived the $89.99 install fee but we are still paying the $69.99 activation fee for the new address.  Keeping the discounts well outweighed that cost, so I'm fine with that.

Our disconnection at the current house is set for the morning after closing (Wednesday at 8am) and they'll be driving over to the new house to install that day as well.  Perfect!



Grading Complete / Seeded

Our lot now looks a bit more normal.

The grading is complete, the hydroseed is down, the driveway has some smaller stone on it and is a bit wider.

Our pre-settlement demonstration is now firmly set with the PM for Friday morning at 9am.

Still waiting to see that door painted "Marooned".


Tuesday, July 21, 2015

Dumpster Gone!

I stopped by the house to meet with a paving contractor for a quote and there was quite a bit of activity!  The dumpster was removed while I was there and the yard was being graded/raked and prepped for seed.

I noticed that the tile guy, the carpet guy, and a painter were all in the house working as well.

I booked our Central A/C install for next Friday.
I have a couple driveway quotes - one much lower than the other.
All of our appliances are scheduled for delivery on Wednesday 7/29.
I'm working on the utilities and rolling our FiOS service over.
Ordering the ceiling fans and garage door opener ASAP.
Need to measure the windows for shades - I forgot when we were last in the house.






The Final Stretch

Well, our pre-settlement demonstration is scheduled for this coming Friday (July 24th).  I haven't yet heard a time from the PM.  We have noticed a few things in the house that I assume will be taken care of before then, but we have a running punch list to go over that day if those items are not resolved (mostly finishing issues like cracks in drywall seams, etc).

Our closing is scheduled for 10am next Tuesday (one week!).

The water heater isn't installed yet, but I assume that is because the wrong one was ordered.  There was a 50gal electric water heater sitting in the garage.  I was briefly concerned that I had remembered wrong, but I checked the MSS on the wall and confirmed that we are slated for a 50gal gas powervent unit.  I also confirmed in the basement that we were plumbed for that gas run and that the correct (120V) power connection was present.

My wife and I finished up the low-voltage end of things getting the house prepped for the certificate of occupancy.  We have plenty to do once we move in, but for now just some basic wall plates are installed until we move in.

We have quite a bit planned for next week.  We'll start moving in slowly everyday after we close with a big push to happen the following weekend, but the days following our closing will be filled with:
-Installing ceiling fans and lighting fixtures to rough-in locations.
-Installing in-ceiling speakers
-Installing the ceiling-mounted wireless access points
-Installing window treatments on many (not all) windows
-Having Central Air Conditioning installed
-(Hopefully) having a the driveway paved
-Installing / Swapping in our new appliances

Much to come and some busy weeks ahead.

Fixtures installed in the upstairs bath.

Our dining room fixture (installed in the morning room).

Stair rails were painted/stained. (The one banister is still cracked).

Picture of where the vent was in the foyer/dining room.  The floor seam would have been right in the middle of the vent.

The cabinets have been mounted 2" higher than their previous location.

Saturday, July 18, 2015

Exterior Complete

A bit gloomier weather today.  Looks like the exterior of the structure is mostly complete.  The falling siding looks to have been secured and the missing fascia is in place.

I'll be in the house Saturday afternoon for a few hours and will have another update after that.

From the update call, it sounds like both coats of paint are done and carpet may start this weekend.

More to come!



Friday, July 17, 2015

Exterior Progress - Siding Completed

I stopped by the house yesterday in the morning to drop off two surge-protected outlets for behind my TV mounting locations.  While in the community (at 8:45am) it was PACKED.  There were probably 2 work trucks/vans at every in-construction house and we currently have many houses in the works.

I ran into the PM and asked him if he wanted the outlets or if I should walk into the house and give to the electricians.  He elected to have me hand them to the electricians.

I didn't grab any pics in the morning since it was so busy.

We drove by last night and saw that our siding was completed, gutters were up, much of the grading work had been started, the drywall in the garage that hadn't been hung yet was now up, and there were still people working at the house around 7pm.

One missing piece of fascia above the front door.
Our exterior lights are different from the other houses...  I checked the elevation printout and they should be the same.  I'm not opposed to being different but I have some concern because they look to be smaller fixtures (cheaper, less light, etc).

That piece of siding needs some help above the Study windows.

Thursday, July 16, 2015

Issues...

So, I've got a variety of items to discuss here.  Most of these aren't extremely important, but the height issue got under my skin a bit.  There are other tiny items that we noticed but I believe they will all be part of the finishing process.  I'll bring them up if they aren't resolved soon.


Water In Basement
This issue seems to have been resolved.  If you've been following the blog, you'll remember that there was 2" or so of water in the basement.  Contributing factors were the sump pump being unplugged, the grading not being completed, a missing basement window, and not yet having a dehumidifier down there.  All of these items except for the grading are resolved.


Floor Seam In Foyer
I received a call from the PM during the hard surface flooring installation.  He wanted to let me know that the floor seam between the foyer and the dining room had become an issue.  Since the plans for the Bateman are from another climate, they only call for one heating duct to the dining area.  Because of our location, two ducts were installed.  One of them ended up right in the floor break between the carpeted dining room and the resilient flooring in the foyer.  We elected to extend the resilient to ensure we had enough flooring in the foyer for wet shoes and such.  Also, we wanted the dining room to be resilient as well but they quoted a cost that was unacceptable to do so.

Wrong Counters
The kitchen counters were mentioned earlier in the blog.  The island was too large to have the beveled edges that were part of the Formica 180fx upgrade (counters B).  So, we elected to have the island squared off and to have the remaining counters kept with the double bevel edge.  Well... the counters we saw Tuesday night were all square.
Wrong counters to the right of the range.

Wrong counters to the left.

Correct counters on the island.
The PM looked into it and says the correct counters were ordered.  The supplier is fabricating the correct tops however they will not be available until after we close.  He said this will be taken care of after closing and it will be in writing.  Our SR suggested we keep the current counters on hand after the swap so that we could use them in the basement if we elected to do so.  We have some ideas here.

By the way the color is correct, and we're happy enough with it, but we are anxious to look into our stone replacement in the near future.  The color is too warm for our liking and we'd prefer something in the gray/silver spectrum.


Cabinet Height
Well, this one was a big deal for me.  I called the PM last week and asked what the cabinet height above the fridge would be before purchasing our appliances.  He had told me 72".  This was important because we planned to buy the over-sized Samsung.  When we were in the house Tuesday, the height measured 71"...  The fridge is 71.5" tall in the back and the door hinge is 73" tall.

Fridge opening
You can see that the cabinets are 1" or more lower than the recess cutout for the fridge in the wall.
I spoke with the PM and he said that the cabinets were in fact at the right height and that his earlier measurement was only an approximation.  He further explained that regardless of that he would pay to have the carpenter move the cabinets 2" higher.

I'm not sure why he took that tact, as he could have easily been positive about the whole thing rather than accusatory and blaming me for relying on the measurement that I specifically called about as I was concerned.  During that phone conversation, I even mentioned that the fridge was 71.5" tall...

Its getting taken care of, but this was a sore spot for me.


Cracked Morning Room Window
Not a big deal as it has been an issue since framing, but one of the windows in the morning room is still cracked.  I'm sure it will be replaced before closing.  It is only mentioned here as it is still pending.


Wednesday, July 15, 2015

Appliances Ordered

We ordered our kitchen appliances yesterday!

We will be ripping out and selling the included builder-grade black GE stuff in the few days after we close.


Fridge:
Samsung RF32FMQDBSR 36" Wide, 30 cu. ft. 4-Door Refrigerator with Cool Select Plus (Stainless Steel)






Range:
Samsung NX58H9500WS Slide-In Gas Range with True Convection (Stainless Steel)
 

 

 

Included Griddle


Included wok plate


Love the front controls.


Microwave:
Samsung ME21F707 2.1 cu. ft. Over-the-Range Microwave (Stainless Steel)
 

 

 

 



Dishwasher:
Samsung DW80J7550US Top Control Dishwasher with WaterWall™ Technology (Stainless Steel)
 

 

 

 

 

 

 

 


We currently own and will be bringing our washer/dryer pair to the new house:

Samsung - 3.7 Cu. Ft. 9-Cycle Ultra Capacity High-Efficiency Washer - Tango Red - WF331ANR/XAA
Samsung - 7.3 Cu. Ft. 9-Cycle Super Capacity Steam Gas Dryer - Tango Red - DV331AGR/XAA

We don't own the pedestals, but this is the best picture I found: