Saturday, June 6, 2015

Rough Electrical Begins

This progress happened on 6/1 and 6/2.

No exterior changes on those days, but lots going on inside.

Roofing materials still awaiting installation

Morning room ceiling, box is for hanging light fixture

4 recessed and 3 pendants in the kitchen

6 total recessed in the great room area, 4 in the great room and 2 in the "dinette"

Switch box on left: 3 switches for flood lights plus 1 for the coach light
Switch box on right: MR light, MR outlet, Kitchen Recessed

4 recessed above the dining room (library) and 2 above the foyer

Light box above study

2 recessed in upstairs hallway

Ceiling fan box in Bedroom 2

Upstairs bath, recessed over tub, exhaust fan box and vanity light

Ceiling fan box in Bed 3

Ceiling fan box in Bed 4

Another view of the hallway

Ceiling fan box in the master

Ceiling lights in the master closet

Ceiling light in the sitting area

Vanity lights in the master bath

Fan box and recessed light above master shower

Took this pic of where Bed 3 meets the garage overhang area.  It is dead space as it sits, so we may eventually cut a closet opening here for some extra storage.